Ecuador port has 3units of 1.8MW DG as power plant,supply power for Cranes, Due to fluctuating load by cranes, generator run load is lower than MIN load limit of the engine. So there need a load bank system to stabilize the grid. Load Bank system have the ability to prevent reverse power of the generator. Load Bank also test the generator power loading and get test report.